Snake River Bridge Down to One Lane Beginning April 27th

April 26, 2018

News Director

Travelers in the Pine City area this weekend could encounter some slowdowns as crews work.

 

Beginning this Friday, the northbound lanes on  the I-35 Snake River Bridge will be closed.

 

To remedy that closure, a traffic switch will be set up in the southbound lane and flow will be reduced to a single lane in each direction.

 

The implementation of the switch came sooner than planned as MnDOT changed their schedule.

 

However, MnDOT says the change in plans will allow them to finish the north and southbound bridges will be done in 2018 and fewer travel impacts will occur in 2019.

 

Share on Facebook
Share on Twitter
Please reload

Recent Posts
Please reload

Archive
Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square

wcmp@q-mediagroup.com | 320-629-7575 | Pine City, Minnesota

FOLLOW US:

  • w-facebook
  • Twitter Clean

© 2019